Send Message
Xian LongWell Machinery Equipment Co., LTD
products
products
Home > products > Mud Pump Parts > AH1301010509 Mud Pump Suction Manifold

AH1301010509 Mud Pump Suction Manifold

Product Details

Place of Origin: China

Brand Name: LONGWELL

Certification: API-7K

Model Number: Oil Drilling Mud Pump

Payment & Shipping Terms

Minimum Order Quantity: 1 PCS

Packaging Details: Plywood case/Iron pallet

Payment Terms: T/T 30%DP, balabce before ship

Supply Ability: 1000 PCS per Month

Get Best Price
Highlight:

BOMCO Mud Pump Suction Manifold

,

Alloy Steel Mud Pump Suction Manifold

,

AH1301010509 Mud Pump Spare Parts

Valve Type:
Full Open
Color:
As Required
Power Rating:
1600 Hp
Application:
Oil And Gas Drilling
Connection Type:
Flanged
Material:
Alloy Steel
Max Working Pressure:
5200 Psi
BOMCO:
F800/1000/1300/1600/1600HL
HONGHUA:
3NB-800/1000/1300/1600F
HRSB:
RS-F800/1000/1300/1600
INGZHOU:
QF-1300/1600
LS-NOW:
3NB1300C/1600
NOV:
12-P-160 14-P-220
WeatherFord:
MP-10/16
GD:
PZ-7/8/9/10/11
EMSCO:
FB-1300/1600
RUSSIAN:
UNBT-950/1180L UNB-600 8T650
Valve Type:
Full Open
Color:
As Required
Power Rating:
1600 Hp
Application:
Oil And Gas Drilling
Connection Type:
Flanged
Material:
Alloy Steel
Max Working Pressure:
5200 Psi
BOMCO:
F800/1000/1300/1600/1600HL
HONGHUA:
3NB-800/1000/1300/1600F
HRSB:
RS-F800/1000/1300/1600
INGZHOU:
QF-1300/1600
LS-NOW:
3NB1300C/1600
NOV:
12-P-160 14-P-220
WeatherFord:
MP-10/16
GD:
PZ-7/8/9/10/11
EMSCO:
FB-1300/1600
RUSSIAN:
UNBT-950/1180L UNB-600 8T650
AH1301010509 Mud Pump Suction Manifold

How to Install the discharge manifold and accessory manifold?

(1) Wash the contacting face between discharge manifold and cylinder blocks well, install the seal ring and put it onto cylinder blocks. The tightening torque of bolt M39×3 is 1954~2255N.m.

 

(2)As per discharge manifold requirement, install the accessory manifold (5-way or 4-way), discharge pulsation dampener, relief valve, bypass valve, and pressure release line etc. The tightening torques of bolts and nuts are required to meet clause 12.2.1.

 

The suction manifold is connected to 3 cylinder blocks simultaneously. It has three ports at left , middle and right. The drilling fluid can be sucked in from left, right or middle port according to your desire.

 

AH1301010509 Mud Pump Suction Manifold 0

 

How to Install the suction manifold and suction desurger?

(1) Install the suction manifold: clean the flange end face of suction manifold,install seal rings and connect it to three cylinder block. The tightening torque of bolt M39×3 is 321~370N.m

 

(2) Install suction the suction desurger:install the suction desurger onto the suction manifold.

 

The discharge manifold is connected with 3 cylinder blocks simultaneously too. It has two ports at left and right side. The drilling fluid can be discharged from left side or right side.

 

The discharge filter shall be installed at the other side of discharge manifold. The discharging mud go to the drilling fluid line (manifold) after filtering.

 

AH1301010509 Mud Pump Suction Manifold 1

 

 

Before the mud discharge manifold needs to be repaired, the bypass valve on pressure release line should be opened first, and let the pressure in discharge manifold to be released to zero.

 

Then install suction manifold and discharge manifold. After adjusting and aligning each part well, use a torque wrench to tighten the connection bolts between suction manifold, discharge manifold and cylinder blocks respectively to specified torque.

 

The fluid end mainly consists of cylinder block, liner, piston, valve, suction manifold, discharge manifold, discharge pulsation dampener, relief valve and spraying device etc.

AH1301010509 Mud Pump Suction Manifold 2