Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | YINDA |
Certification: | API 7K |
Model Number: | Triplex Mud Pump |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 |
Price: | USD/CNY |
Packaging Details: | Plywood case / Iron plate |
Delivery Time: | In stock |
Payment Terms: | T/T 30%DP, Balance before delivery |
Supply Ability: | In stock |
Detail Information |
|||
Usage: | Drill Rig | Application: | Conveying Mud And Flushing Fluids |
---|---|---|---|
Structure: | Piston Pump | Standard Or Nonstandard: | Standard |
Type: | Mud Pump | Product Name: | Mud Pump |
Oem: | Applicable | Condition: | New |
High Light: | mechanical pump seal,chemical resistant o rings |
Product Description
Honghua HHF1600 Mud Pump Cylinder Head Flange, Mud Pump Fluid End NB800M.05.02 GH3161-05.02 NB100.05.02 was used in Mud Pump Fluid End.
Cylinder head flange is installed on the back of the hydraulic cylinder, It is fixed on the hydraulic cylinder through the double-threaded screw and used for fixing on the cylinder linder indirectly.Cylinder liner gland connects with cylinder head flange and compresses the cylinder liner tightly.The blank of cylinder head flange is 45 steel forging.
A Mud Pump Cylinder Head Flange can also be a plate or ring to form a rim at the end of a pipe when fastened to the pipe (for example, a closet Mud Pump Cylinder Head Flange). A blind Mud Pump Cylinder Head Flange is a plate for covering or closing the end of a pipe. A Mud Pump Cylinder Head Flange joint is a connection of pipes, where the connecting pieces have Mud Pump Cylinder Head Flanges by which the parts are bolted together.
Although the word Mud Pump Cylinder Head Flange generally refers to the actual raised rim or lip of a fitting, many Mud Pump Cylinder Head Flanged plumbing fittings are themselves known as 'Mud Pump Cylinder Head Flanges':
Common Mud Pump Cylinder Head Flanges used in plumbing are the Surrey Mud Pump Cylinder Head Flange or Danzey Mud Pump Cylinder Head Flange, York Mud Pump Cylinder Head Flange, Sussex Mud Pump Cylinder Head Flange and Essex Mud Pump Cylinder Head Flange. Surrey and York Mud Pump Cylinder Head Flanges fit to the top of the hot water tank allowing all the water to be taken without disturbance to the tank. They are often used to ensure an even flow of water to showers. An Essex Mud Pump Cylinder Head Flange requires a hole to be drilled in the side of the tank.
There is also a Warix Mud Pump Cylinder Head Flange which is the same as a York Mud Pump Cylinder Head Flange but the shower output is on the top of the Mud Pump Cylinder Head Flange and the vent on the side. The York and Warix Mud Pump Cylinder Head Flange have female adapters so that they fit onto a male tank, whereas the Surrey Mud Pump Cylinder Head Flange connects to a female tank.
A closet Mud Pump Cylinder Head Flange provides the mount for a toilet.
Mud Pump Parts Model We Can Do
BOMCO |
F-500 |
F-800 |
F-1000 |
F-1300 |
F-1600 |
F-1600HL |
F-1600L |
F-2200HL |
Hong Hua |
HHF-500 |
HHF-800 |
HHF-1300 |
HHF-1600 |
3NB-1600F |
5NB-1600 |
5NB-2400 |
|
HRSB | RSF-1300 | RSF-1600 |
|
|||||
RG |
RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 |
|
|||
Lanzhou |
3NB1000C |
3NB1300C |
3NB1600F |
3NB1600L |
|
|
|
|
EMSCO |
F-500 |
F-800 |
F-1000 |
F-1300 |
F-1600 |
FD-1000 |
FC-2200 |
FB-1300 |
Gardner Denver |
PAH |
P7 |
P8/9 |
P10/11 |
|
|
|
|
National |
7-P-50 |
8-P-80 |
9-P-100 |
10-P-130 |
12-P-160 |
14-P-200 |
14-P-220 |
|
Oilwell |
A-850-PT |
A-1100-PT |
A-1400-PT |
A-1700-PT |
|
|
|
|
TSC |
WF-500 |
WF-800 |
WF-1000 |
WF-1300 |
WF-1600 |
WF-2000 |
WF-2200 |
|
IDECO |
T-500 |
T-800 |
T-1000 |
T-1300 |
T-1600 |
|
|
|
RUSSIA |
UNBT-1180L |
UNBT-950A |
UNB-600 |
|
|
|
|
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.
More customer view:16-TSCmudpumpparts12-yindapump.com.pdf
Enter Your Message