Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | YINDA |
Certification: | API 7K |
Model Number: | Triplex Mud Pump |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 |
Price: | USD/CNY |
Packaging Details: | Plywood case / Iron plate |
Delivery Time: | In stock |
Payment Terms: | T/T 30%DP, Balance before delivery |
Supply Ability: | In stock |
Detail Information |
|||
Usage: | Drill Rig | Application: | Conveying Mud And Flushing Fluids |
---|---|---|---|
Structure: | Piston Pump | Standard Or Nonstandard: | Standard |
Type: | Mud Pump | Product Name: | Mud Pump |
Oem: | Applicable | Condition: | New |
High Light: | suction manifold,pump assembly,BOMCO Mud Pump Discharge Manifold |
Product Description
BOMCO Mud Pump Discharge Manifold,AH1301010509,AH36001-05.09,AH130101052200,AH36001-05.32A.00
The fluid end mainly consists of cylinder block, liner, piston, valve, suction manifold, discharge manifold, discharge pulsation dampener, relief valve and spraying device etc.
The arrangement of lines and valves used to direct and control fluid on a pumping unit. The manifold on the pump suction is generally known as the inlet or low-pressure manifold. The corresponding manifold located on the pump discharge is commonly known as the high-pressure or discharge manifold. In most cases, reference to the pump manifold relates to the high-pressure manifold.
The discharge manifold is connected with 3 cylinder blocks simultaneously too. It has two ports at left and right side. The drilling fluid can be discharged from left side or right side.
The discharge filter shall be installed at the other side of discharge manifold. The discharging mud go to the drilling fluid line (manifold) after filtering.
Before the mud discharge manifold needs to be repaired, the bypass valve on pressure release line should be opened first, and let the pressure in discharge manifold to be released to zero.
Then install suction manifold and discharge manifold. After adjusting and aligning each part well, use a torque wrench to tighten the connection bolts between suction manifold, discharge manifold and cylinder blocks respectively to specified torque.
How to Install the discharge manifold and accessory manifold?
(1) Wash the contacting face between discharge manifold and cylinder blocks well, install the seal ring and put it onto cylinder blocks. The tightening torque of bolt M39×3 is 1954~2255N.m.
(2)As per discharge manifold requirement, install the accessory manifold (5-way or 4-way), discharge pulsation dampener, relief valve, bypass valve, and pressure release line etc. The tightening torques of bolts and nuts are required to meet clause 12.2.1.
The suction manifold is connected to 3 cylinder blocks simultaneously. It has three ports at left , middle and right. The drilling fluid can be sucked in from left, right or middle port according to your desire.
How to Install the suction manifold and suction desurger
(1) Install the suction manifold: clean the flange end face of suction manifold,install seal rings and connect it to three cylinder block. The tightening torque of bolt M39×3 is 321~370N.m
(2) Install suction the suction desurger:install the suction desurger onto the suction manifold.
Mud Pump Parts Model We Can Do
BOMCO |
F-500 |
F-800 |
F-1000 |
F-1300 |
F-1600 |
F-1600HL |
F-1600L |
F-2200HL |
Hong Hua |
HHF-500 |
HHF-800 |
HHF-1300 |
HHF-1600 |
3NB-1600F |
5NB-1600 |
5NB-2400 |
|
HRSB | RSF-1300 | RSF-1600 |
|
|||||
RG |
RGF-800 | RGF-1000 | RGF-1300 | RGF-1600 |
|
|||
Lanzhou |
3NB1000C |
3NB1300C |
3NB1600F |
3NB1600L |
|
|
|
|
EMSCO |
F-500 |
F-800 |
F-1000 |
F-1300 |
F-1600 |
FD-1000 |
FC-2200 |
FB-1300 |
Gardner Denver |
PAH |
P7 |
P8/9 |
P10/11 |
|
|
|
|
National |
7-P-50 |
8-P-80 |
9-P-100 |
10-P-130 |
12-P-160 |
14-P-200 |
14-P-220 |
|
Oilwell |
A-850-PT |
A-1100-PT |
A-1400-PT |
A-1700-PT |
|
|
|
|
TSC |
WF-500 |
WF-800 |
WF-1000 |
WF-1300 |
WF-1600 |
WF-2000 |
WF-2200 |
|
IDECO |
T-500 |
T-800 |
T-1000 |
T-1300 |
T-1600 |
|
|
|
RUSSIA |
UNBT-1180L |
UNBT-950A |
UNB-600 |
|
|
|
|
FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure
More customer view:58-Fluid Module-yindapump.com.pdf
Enter Your Message