Send Message
Sanyuan Yinda Petroleum Machinery Co.,Ltd

HONGHUA Mud Pump Spares Suction Manifold GH3101-05.28.00 NB2200G.05.40.00

Product Details:
Place of Origin: China
Brand Name: YINDA
Certification: API 7K
Model Number: Triplex Mud Pump
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: USD/CNY
Packaging Details: Plywood case / Iron plate
Delivery Time: In stock
Payment Terms: T/T 30%DP, Balance before delivery
Supply Ability: In stock
  • Detail Information
  • Product Description

Detail Information

Usage: Drill Rig Application: Conveying Mud And Flushing Fluids
Structure: Piston Pump Standard Or Nonstandard: Standard
Type: Mud Pump Product Name: Mud Pump
Oem: Applicable Condition: New
High Light:

gasket ring

,

suction manifold

,

Mud Pump Spares Suction Manifold

Product Description

HONGHUA Mud Pump Suction Manifold, GH3101-05.28.00 NB2200G.05.40.00 NB800M.05.29.00 GH3161-05.25.00

 

 

The fluid end mainly consists of cylinder block, liner, piston, valve, suction manifold, discharge manifold, discharge pulsation dampener, relief valve and spraying device etc.

 

BOMCO Mud pump Discharge/Suction manifold,AH1301010509,AH36001-05.09,AH130101052200,AH36001-05.32A.00

 

The discharge manifold is connected with 3 cylinder blocks simultaneously too. It has two ports at left and right side. The drilling fluid can be discharged from left side or right side.

 

The discharge filter shall be installed at the other side of discharge manifold. The discharging mud go to the drilling fluid line (manifold) after filtering.

 

Before the mud discharge manifold needs to be repaired, the bypass valve on pressure release line should be opened first, and let the pressure in discharge manifold to be released to zero.

 

Then install suction manifold and discharge manifold. After adjusting and aligning each part well, use a torque wrench to tighten the connection bolts between suction manifold, discharge manifold and cylinder blocks respectively to specified torque.

 

How to Install the discharge manifold and accessory manifold?

(1) Wash the contacting face between discharge manifold and cylinder blocks well, install the seal ring and put it onto cylinder blocks. The tightening torque of bolt M39×3 is 1954~2255N.m.

(2)As per discharge manifold requirement, install the accessory manifold (5-way or 4-way), discharge pulsation dampener, relief valve, bypass valve, and pressure release line etc. The tightening torques of bolts and nuts are required to meet clause 12.2.1.

 

The suction manifold is connected to 3 cylinder blocks simultaneously. It has three ports at left , middle and right. The drilling fluid can be sucked in from left, right or middle port according to your desire.

 

How to Install the suction manifold and suction desurger

(1) Install the suction manifold: clean the flange end face of suction manifold,install seal rings and connect it to three cylinder block. The tightening torque of bolt M39×3 is 321~370N.m

(2) Install suction the suction desurger:install the suction desurger onto the suction manifold.

 

 

Mud Pump Parts Model We Can Do

 

BOMCO

F-500

F-800

F-1000

F-1300

F-1600

F-1600HL

F-1600L

F-2200HL

Hong Hua

HHF-500

HHF-800

HHF-1300

HHF-1600

3NB-1600F

5NB-1600

5NB-2400

 

HRSB RSF-1300 RSF-1600          

 

RG

RGF-800 RGF-1000 RGF-1300 RGF-1600      

 

Lanzhou

3NB1000C

3NB1300C

3NB1600F

3NB1600L

 

 

 

 

EMSCO

F-500

F-800

F-1000

F-1300

F-1600

FD-1000

FC-2200

FB-1300

Gardner Denver

PAH

P7

P8/9

P10/11

 

 

 

 

National

7-P-50

8-P-80

9-P-100

10-P-130

12-P-160

14-P-200

14-P-220

 

Oilwell

A-850-PT

A-1100-PT

A-1400-PT

A-1700-PT

 

 

 

 

TSC

WF-500

WF-800

WF-1000

WF-1300

WF-1600

WF-2000

WF-2200

 

IDECO

T-500

T-800

T-1000

T-1300

T-1600

 

 

 

RUSSIA

UNBT-1180L

UNBT-950A

UNB-600

 

 

 

 

 

 

FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you? 
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.

3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

 

More customer view:45-emscof800.htm-yindapump.com.pdf

Get in touch with us

Enter Your Message

You Might Be Into These