Send Message
Sanyuan Yinda Petroleum Machinery Co.,Ltd

Mud Pump JA-3 Shear Pin Relief Valve HH-3-000-043 Haihua F1600 For Drilling

Product Details:
Place of Origin: China
Brand Name: YINDA
Certification: API 7K
Model Number: Triplex Mud Pump
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: USD/CNY
Packaging Details: Plywood case / Iron plate
Delivery Time: In stock
Payment Terms: T/T 30%DP, Balance before delivery
Supply Ability: In stock
  • Detail Information
  • Product Description

Detail Information

Usage: Drill Rig Application: Conveying Mud And Flushing Fluids
Structure: Piston Pump Standard Or Nonstandard: Standard
Product Name: Mud Pump Oem: Applicable
Condition: New
High Light:

shear pin relief valve

,

mud pump parts

,

mud pump shear pin relief valve

Product Description

Haihua F1600 Mud Pump JA-3 Shear Pin Relief Valve, HH-3-000-043 mud pumps for drilling rigs

 

 

Haihua F1600 Mud Pump JA-3 Shear Pin Relief Valve, HH-3-000-043, It is recommended that a suction pressure relief valve be used in the suction line to prevent damage to either pump in the event of a high pressure surge occurring in the line.

 

It is recommended that the valve be located on the suction manifold of the pump, but may be located elsewhere on the suction line at the customer’s discretion.

 

The outlet line from the relief valve should gradually slope down to the tank level, and should be supported to prevent any dips or low spots where mud could collect, harden and potentially block flow.

 

The relief valve should be set to 50% greater than the normal operating pressure (70 psi for normal operations, but this value may vary depending on the specifics of the job).

 

Application
Safety valve is used as a mud pump fluid end accessory in the oil drilling industry.

Function
The safety valve serves to guarantee smooth operation of a mud pump within rated working pressure range.

Features
The safety valve offers easy reset, flexible operation, small bearing area, and high universality.

 

Shear pin safety valve is used at the discharge part of the mud pump.JA-3 shear pin safety valve changes the discharging pressure by changing the position of the shear pin ,which is operation easy and work reliable.

 

JA-3 Shear Relief Valve, also named shear pin safety valve is used at the discharge part of the mud pump.

JA-3 shear pin safety valve changes the discharging pressure by changing the position of the shear pin ,which is operation easy and work reliable.

 

connection type:

screw thread

flange

 

Features:

1. Opening and shutting neatly.

2. Piston's bearing pressure area is small.

3. To reposition simply.

4. Safety Valve may use for multifold mud pumps.

5. flange / screw thread connection

6. Max pressure:35Mpa

 

BOMCO mud pump JA-3 Shear pin relief valve,AH0000060100,AH33003-00,AH0000060200,AH33007-00,

 

Mud Pump Parts Model We Can Do

 

BOMCO

F-500

F-800

F-1000

F-1300

F-1600

F-1600HL

F-1600L

F-2200HL

Hong Hua

HHF-500

HHF-800

HHF-1300

HHF-1600

3NB-1600F

5NB-1600

5NB-2400

 

HRSB RSF-1300 RSF-1600          

 

RG

RGF-800 RGF-1000 RGF-1300 RGF-1600      

 

Lanzhou

3NB1000C

3NB1300C

3NB1600F

3NB1600L

 

 

 

 

EMSCO

F-500

F-800

F-1000

F-1300

F-1600

FD-1000

FC-2200

FB-1300

Gardner Denver

PAH

P7

P8/9

P10/11

 

 

 

 

National

7-P-50

8-P-80

9-P-100

10-P-130

12-P-160

14-P-200

14-P-220

 

Oilwell

A-850-PT

A-1100-PT

A-1400-PT

A-1700-PT

 

 

 

 

TSC

WF-500

WF-800

WF-1000

WF-1300

WF-1600

WF-2000

WF-2200

 

IDECO

T-500

T-800

T-1000

T-1300

T-1600

 

 

 

RUSSIA

UNBT-1180L

UNBT-950A

UNB-600

 

 

 

 

 

 

FAQ
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.

2) How can I pay you? 
A: After you confirm our PI, we will request you to pay. T/T is the most usual ways we are using.

3) What's the order procedure?
A: First we discuss order details, production details. Then we issue you an PI for your confirmation. You will be requested to do pr-e paid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.

4) How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.

5) How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.

 

More customer view:81-pulsation dampener-yindapump.com.pdf

Get in touch with us

Enter Your Message

You Might Be Into These